Exit lane work affects Clinton

Beginning Monday, March 4 and continuing through Friday, March 8, the ferry exit lanes at Clinton will undergo concrete repairs. According to Washington State Ferries, this will require periodic exit lane shifting and one day of single-lane offloading.

Beginning Monday, March 4 and continuing through Friday, March 8, the ferry exit lanes at Clinton will undergo concrete repairs.

According to Washington State Ferries, this will require periodic exit lane shifting and one day of single-lane offloading.

Work will be from 7 a.m. to 3 p.m. each day.  Drivers and riders should use caution when exiting as steel plates may be in place.